• Johor Bahru Office 44 & 44A, Jalan Palma Rafis 1, Taman Dato Chellam, 81800 Ulu Tiram, Johor, Malaysia.
  • Call us +607-8660510
  • Email us enquiry@saturnpyro.com
Voltage DetectorsInsulation PolesEarthing and Short-Curcuit EquipmentInsulationPersonal Protection EquipmentLockout & Tagout (LOTO)First Aid and PreventionLadderDisplayARC Flash Protection Suits Arc Flash Suit Fibre Glass Ladders & Work PlatformsSignalizationUlirvision - Thermal Monitoring System Others

Saturn Pyro Sdn Bhd
44 & 44A, Jalan Palma Rafis 1,
Taman Dato Chellam,
81800 Ulu Tiram,
Johor, Malaysia.
+607-8660510
+607-8660511

Saturn Pyro Sdn Bhd
Johor Bahru Office
44 & 44A, Jalan Palma Rafis 1,
Taman Dato Chellam,
81800 Ulu Tiram,
Johor, Malaysia.
+607-8660510
+607-8660511
enquiry@saturnpyro.com
 
Shah Alam Office
K03-03-12, Tower 3,
UOA Business Park,
No 1, Jalan
Pengaturcara U1/51A,
Section U1, Kawasan
Perindustrian Temasya,
40150 Shah Alam,
Selangor, Malaysia.
+607-8660510
+607-8660511
Penang Office
Penthouse 1-21-1,
Suntech @ Penang Cybercity
Lintang Mayang Pasir 3,
11950 Bayan Baru,
Penang, Malaysia.
+607-8660510
+607-8660511
desmond@saturnpyro.com

Bangalore Office
Saturnpyro Solutions Pvt. Ltd.

SFS-B-38, 1st Floor, 7th B Main Road,
Yelahanka New Town, Bangalore 560 064.
GSTIN: 29ABCCS4606C1ZK
+91 829 192 0602
+601 7488 7001
 
India Office
3, Gr Floor, Eishita,
Shiv Vallabh Cross Road,
Ashokvan, Dahisar (E.),
Mumbai 400068.
+91 22284 84682
+91 98191 56654


662 PATL-MPLB

Previous 1 / 24 Next

662 PATL-MPLB Medium Voltage Earthing Equipments Earthing and Short-Curcuit Equipment 662 PATL-MPLB Medium Voltage Earthing Equipments Earthing and Short-Curcuit Equipment


Download Files

TECHNICAL_SPECIFICATIONS.pdf (1.22 MB)
INSTRUCTIONS_FOR_USE.pdf (688.63 KB)
CATALOG_INFORMATION.pdf (866.31 KB)
Medium voltage overhead lines - Screw clamps
Earthing and short-circuit equipment for medium voltage overhead lines.
The main aim for its installation is operator’s protection against an accidental commissioning or possible voltage return during repair operations.
The MPL clamp is fixed on bare conductors by screw-tightening. This equipment has got a MPLP clamp (carrier) which facilitates the lifting and placing of the three clamps at the same time reducing installation time considerably.
 
According to IEC 61230 standard.
 
Composed of:
2 MPL aluminium alloy clamps with screw tighten for cylindrical conductors with diameter between 5 and 45 mm.
1 MPLP aluminium alloy clamp (carrier) with screw tighten for cylindrical conductors with diameter between 5 and 45 mm.
2 copper cables with PVC insulation of 70 mm² section and 2.5 m long.
1 copper cable with PVC insulation of 70 mm² section and 15 m long.
1 TT-50 milling earthing lathe.
1 earthing rod.
1 telescopic pole (1.10 m folded and 2 m extended).
1 bag to store and transport the equipment.
1 bag to store and transport the pole and the earthing rod.

Specifications


 

Switch to Mobile Version
Recent Updates